| CUSTOMER |
PROJECT |
| YARA TRINIDAD LTD. |
OPENING AND WASHING OF 14 EXCHANGERS AND REPAIRS/INSULATION WORKS ON 1 20" DIA X 55 FT DUCTING |
| METHANOL HOLDINGS (TRINIDAD) |
REPAIR LEAKS ON CO2 PIPING, FABRICATE AND INSTALL PIPE |
| METHANOL HOLDINGS (TRINIDAD) |
RESHEETING OF P-FB-202A TANK BASE |
| METHANOL HOLDINGS (TRINIDAD) - AUM |
FABRICATE AND INSTALL STRUCTURAL BEAMS AND SUPPORTS |
| METHANOL HOLDINGS (TRINIDAD) - AUM |
REPAIR LEAKS ON UNDERGROUND PIPING |
| ATLAS METHANOL COMPANY UNLIMITED |
WCR CATALYST SUPPORT |
| METHANOL HOLDINGS (TRINIDAD) |
M1 2012 OUTAGE |
| METHANEX TRINIDAD UNLIMITED |
SUPPLY OF LABOUR FOR TECHNICAL WORKS ON ECT 2001/E01005 |
| POINT LISAS NITROGEN LIMITED |
REPLACEMENT OF AIR PIPING |
| YARA TRINIDAD LIMITED |
MAINTENANCE WORK ON TRINGEN I |
| PETROTRIN |
SHOP FABRICATION OF AIR PREHEATED DUCTS |
| NATIONAL GAS COMPANY |
INSTALLATION OF VICTAULIC PIPING AT CARONI |
| CUSTOMER |
DESCRIPTION OF WORKS |
|
|
| YARA TRINIDAD LTD |
OPENING AND WASHING OF 14 EXCHANGERS AND REPAIRS/INSULATION WORKS ON 1 20" DIA X 55 FT DUCTING |
|
|
| METHANOL HOLDINGS (TRINIDAD) |
REPAIR LEAKS ON CO2 PIPING, FABRICATE AND INSTALL PIPE |
|
|
| METHANOL HOLDINGS (TRINIDAD) |
RESHEETING OF P-FB-202A TANK BASE |
|
|
| METHANOL HOLDINGS (TRINIDAD) - AUM |
FABRICATE AND INSTALL STRUCTURAL BEAMS AND SUPPORTS |
|
|
| METHANOL HOLDINGS (TRINIDAD) - AUM |
REPAIR LEAKS ON UNDERGROUND PIPING |
|
|
| ATLAS METHANOL COMPANY UNLIMITED |
WCR CATALYST SUPPORT |
|
|
| METHANOL HOLDINGS (TRINIDAD) |
M1 2012 OUTAGE |
|
|
| METHANEX TRINIDAD UNLIMITED |
SUPPLY OF LABOUR FOR TECHNICAL WORKS ON ECT 2001/E01005 |
|
|
| POINT LISAS NITROGEN LIMITED |
REPLACEMENT OF AIR PIPING |
|
|
| YARA TRINIDAD LIMITED |
MAINTENANCE WORK ON TRINGEN I |
|
|
| PETROTRIN |
SHOP FABRICATION OF AIR PREHEATED DUCTS |
|
|
| NATIONAL GAS COMPANY |
INSTALLATION OF VICTAULIC PIPING AT CARONI |
|