| CUSTOMER |
PROJECT |
| ARAWAK CEMENT LTD CO, BARBADOS |
REPLACEMENT OF CLINKER CONVEYOR |
| CARIBBEAN NITROGEN CO., TRINIDAD |
CHANGEOUT OF EXCHANGER #114 C, T203 N2000 TAR 2009 - PACKAGE A, SUPPLY OF LABOUR , MECHANICAL WORKS ON 101 CNC PLANT, STATIONARY EQUIPMENT & TECHNICAL PROJECTS, SUPPLY OF MANPOWER |
| TRINGEN 11, TRINIDAD |
INSTALL BLINDS ON E3401 BORSIG BOILER, SUPPLY OF LABOUR TO WORK ON E2221 SYN, CONVERTER BFW EXCHANGER AT TRINGEN 1 PLANT |
| POINT LISAS NITROGEN CO., TRINIDAD |
MARCH 2009 PLANT SHUTDOWN |
| METHANOL HOLDINGS UNLIMITED, T'DAD |
REFORMER OUTAGE, M3 WASTE HEAT BOILER OUTAGE, M4 TAR 2009 SHUT DOWN, MECHANICAL WORKS |
| MAINTENANCE ENTERPISES INC (M.E.I) |
REPAIR STRUCTUAL STEEL @ P.C.S , CAT STAND EXTENSION @ PCS, INSTALLATION OF TRANSITION ROOF & DAMPER, INSTALLATION OF PROCESS AIR COIL , ON PCS 02 PLANT |
| PCS NITROGEN, TRINIDAD |
PART REPLACEMENT & SANDBLASTING OF : 01/02 NATURAL GAS LINE, INSTALLATION OF CYCLONES FOR THE DE-DUSTING, SYSTEM @ UREA PLANT GRANULATION |
| INTEGRATED SERVICE CO. |
SUPPLY OF LABOUR & SCAFFOLDING FOR: SUPPLY OF TOOLS SUPPLIES AND RENTAL OF ONE CONTAINER |
| METHANEX T'DAD UNLIMITED, TRINIDAD |
SUPPLY OF LABOUR FOR OPERATIONS, SUPPLY OF LABOUR FOR MAINTENANCE WORK, MECHANICAL FABRICATION SERVICES FO BFW , TURBINE INLET PIPING MODIFICATION |
| YARA TRINIDAD LIMITED |
SUPPLY OF LABOUR TO INSTALL & PULL BLINDS, MECHANICAL REPLACEMENT OF SPN 2 LOADING, ARM & ASSOCIATION PIPING WORKS |
| ATLAS METHANOL |
SUPPLY OF LABOUR FOR ATLAS OUTAGE |
| PETROTRIN |
REPAIRS TO LOCHRIN FENCE |
| CARIBBEAN CEMENT CO. LTD. |
REPLACEMENT OF BIN STRUCTURE |
| TRINIDAD OFFSHORE FABRICATORS |
SUPPLY OF LABOUR, MODIFICATION TO BG WELD 1 & 2 DUPLEX |
| BLACK & VEATCH |
MODIFICATION AS PER DESIGNS DRAWINGS, CHANGE NOTICE 9DCN |
| ATLANTIC LNG CO. TT. |
PROVISION OF FABRICATION SERVICES FOR : ROOF REPAIRS WORKS ON TANK D-2401A |
| JOHNSON MATTHEY, UK |
SUPPLY OF LABOUR |
| ETECK , TRINIDAD |
TANK #1 DESIGN & FABRICATION |