| CUSTOMER |
PROJECT |
| ATLAS METHANOL |
Turnaround |
| BLUEWATERS INC. |
Fabrication of PLEM |
| ISG TRNIDAD |
Manufacture of Ducting |
| PCS NITROGEN TRINIDAD |
To disconnect pipework, lift out exchangers E736 A&B And Install New Exchanger |
| CARIBBEAN ISPAT LIMITED |
DR2 Shutdown 2005 – Reformer Mechanical Work |
| CUST-O-FAB |
PCS Nitrogen Plant 3 Revamp |
| LEXICON INC |
Heat Recovery Installation |
| MEI INC. |
PCS Nitrogen – Installation of Mole Sieve/Skid/Absorbers Oil Separator Foundation |
| METHANEX TRINIDAD UNLIMITED |
Pres-shutdown work for ATR |
| MUSTANG ENGINEERING |
Fabrication of 1 Depropaniser Skid |
| NEAL & MASSY WOODGROUP |
Piping & Mechanical Installation – BG Slug Catcher |
| TAYLOR FORGE ENGINEERED SYSTEMS INC |
British Gas Slug Catcher |
| TRINIDAD CEMENT LIMTIED |
MILL 3 Upgrade Works |
| YARA TRINIDAD LIMITED |
Cost Plus Work |
|